OIKVRA
OIKVRA · Documentation · English

Manufacturing and production

A production order connects the bill of materials, operations, component consumption and output. Stock control must prevent the same component from being consumed twice.

How this process works

A production order connects the bill of materials, operations, component consumption and output. Stock control must prevent the same component from being consumed twice.

Reference map: This diagram explains the business process. Automatic execution depends on licensed modules, permissions, settings and the installed version.

Manufacturing and production: Where does the information come from? Process steps explained What does the process produce?
Workflows MAN-01 · Open SVG · Open PNG

Where does the information come from?

  • Manufactured product and BOM
  • Production routing
  • Available materials

What does the process produce?

  • Finished goods inventory
  • Reference production cost
  • Traceability and waste

Process steps explained

  1. Plan the production orderChoose product, quantity and component requirements.
  2. Reserve resourcesVerify material and work-center capacity.
  3. Consume componentsPost actual use with stock and lot concurrency checks.
  4. Record operationsCapture labor, time, progress and scrap.
  5. Complete productionVerify accepted quantity, waste and production lot.
  6. Record the resultMake finished goods, traceability and reference cost available.

Checks and special situations

Important ruleInventory facts are shared through the installation database while preserving the authorized owner of each write.

Fields that explain this workflow

These identifiers are documentation proposals for future Shift+F1 integration. Publishing this page does not modify ERP fields or shortcuts.

Field and keyMeaningSourceImpact
BOM componentFIELD.MFG.BOM.COMPONENTMaterial required by the product.Approved bill of materials.Defines requirements and cost.
Planned quantityFIELD.MFG.ORDER.QUANTITYTarget quantity in the production order.Authorized production plan.Determines material needs.
Scrap quantityFIELD.MFG.OPERATION.SCRAPUnits rejected or unusable.Operation record.Affects yield and cost.
Produced lotFIELD.MFG.ORDER.LOTIdentifier for traceability of output.Completion and lot assignment.Supports history and recalls.

Where to find out more

View the mapping of all 92 technical components.